Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | Provided |
Suppliers with verified business licenses
China TOP Brand YUCHAI Diesel Engine as standard Power, Cummins Engine is Optional This Self Loading Concrete Mixer is driven by YUCHAI ,85kW (116 HP), 4 Cylinder , Turbo-charged , Water -cooled Diesel Engine. |
The bucket of this mixer could overturn when lifted to high position, loading and discharging material like wheel loader. Itcould be a substitute for wheel loader to some combining the function of wheel loader, concrete mixer and concretemixer truck together. | The Chassis of this machine is articulated structure, which could make the machine more flexible and get shorter turning radius than that with integrated chassis |
The mixing Drum could slew hydraulically up to 270° for high discharge over 2 m on the four sides of the vehicle. One set of1.2 m chute is standard equipment. The extraprolonged chute is availabe uponrequest. |
The machine is equipped with Off Road Industrial Steel Wire Line Tyre with model of 16/70-20, PR14. The drive means is4x4 .The steel wire line tyre is much more strongernylon tyre, which could ensure the mac safe on muddy andbumpy road. |
Two PCS of Water Tank are positioned opposite each other at the rear of machine, with total volume of 500 Liter. The electricwater pump is mounted on the top of water tank,which is beneficial to suck water from water tankeasily. |
>> Certification
SM150 | ||
Mixing Drum | Mixing Volume | 1500 L |
Geometric Volume | 2300 L | |
Concrete Output | 1500 L/ batch , 4 Batches/ hr | |
Inclination Angle | 16° | |
Max. Slewing Angle | 0° | |
Rotating Speed | 10~21 rpm | |
Body /Bottom Thickness | 4 mm/6 mm(Q345B) | |
Overall Size | 1350x 1920 | |
Chute | Max. Slewing Angle | 180° |
Tilting Method | Mechanically | |
Length | 450mm +1200 mm (2 Sections) | |
Engine | Brand | KAITIAN |
Model | SM150 | |
Rated Power/Speed | 75 HP /2400 rpm | |
Max.Torque/ Speed | 237 N.m/1800 rpm | |
Bore x Stroke | 90 mm x105 mm | |
Displacement | 2.7 L | |
Type | 4-Cylinder,In-line, | |
Turbo Charged, Water-cooled | ||
Emission Standard | Euro II | |
Hydraulic System | Reducer Model | KY07-2-0 |
Hydraulic Pump Displacement | 50/40 mL/r | |
Hydraulic Motor Displacement | 160 mL/ r | |
Water Supply System | Water Tank Volume | 2 x 200 L |
Water Supply Mode | Self-contained, Electrically | |
Chassis | Structure | Articulated Structure |
Drive Type | 4 X 4 | |
Transmission | 2 Forward +2 Reverse Shift (Low+ High Speed) | |
Torque converter | YJ265 | |
Gearbox Mode | Counter Shaft, Power-shift | |
Wheelbase | 2300 mm | |
Tread | 1550 mm | |
Loading Shovel Capacity | 500 L | |
Brake Type | Air Brake | |
Tyre Size | 20.5/70-16 | |
Vehicle | Drum and Shovel Control | By 2 Sets of Joystick |
Driver's Cab | Air-conditioner Inside | |
Max. Drive Speed | 30 km/h | |
Grade Ability | 0.3 | |
Mini Turning Radius | 4750 mm | |
Max. Payload | 3,600 kg | |
Operating Weight | 4,500 kg | |
Overall Size | 6400 x 2550x 2450 mm |
Acting as a good adviser, our well-trained sales groups and professional technical team propose most rational solutions for our valued client as per practical project requirement. >> Select suitable model & matched equipment. >> Strong technical support. Reply clients' questions within 24 hours. |
We have responsible team from raw material to finished products, and guarantee 100% pass rate. >> Design and manufacture products basis of client's special requirement >> Inspect each machine & matched accessories strictly before delivery >> Timely inform client of production progress. |
We're always with you in after-sale service. >> We can arrange related after-sales representatives for debugging and training at worksite when starting up. >> E-mail, call or door-to-door service in later using.
|
Beijing Jincheng Mining Technology Co.,Ltd(JCDRILL) provide users high quality Mining & Drilling solutions,we always focus on the strategic conception of "Survival by quality, Development by credit''.
We have specilized in research, development and produce of rock blasting drilling rig, water well drilling rig, diamond core drilling rig, anchor drilling rig, and relative accessories & drilling services. constantly provide professional drilling solutions for all customers with our advanced technology, excellent equipment, strict testing means and good service network,which establish our brand "JCDRILL" a good image of market, now,we products account for 50% of domestic market and have been export to more than 40 countries, and we awarded ISO9001: 2000 in November, 2002.
With excellent technology and solid market service capabilities, we have both a sound marketing system and excellent service support system, which help us win confidence of customers both at home and abroad,we can provide drilling rig users with high quality professional air compressor solution and relative after-sales service also.
|
>> FAQ
Q: Are you original manufacturer?
|
Q: Which payment terms are available to us? |
Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. |
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? | Q: How about after sales service? |
Q:Spare Parts When You Need Them |
A: Normally products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. |
A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours." |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |